Array
(
    [_edit_lock] => Array
        (
            [0] => 1700739633:30
        )

    [tdc_dirty_content] => Array
        (
            [0] => 1
        )

    [tdc_icon_fonts] => Array
        (
            [0] => a:0:{}
        )

    [post_views_count] => Array
        (
            [0] => 445
        )

    [_thumbnail_id] => Array
        (
            [0] => 138190
        )

    [_edit_last] => Array
        (
            [0] => 30
        )

    [_post_language] => Array
        (
            [0] => English
        )

    [_molongui_author] => Array
        (
            [0] => guest-97702
        )

    [_molongui_main_author] => Array
        (
            [0] => guest-97702
        )

    [td_post_theme_settings] => Array
        (
            [0] => a:1:{s:11:"td_subtitle";s:132:"Zairil Khir Johari says based on port commission’s comments, ship navigation width of 2.2m has to be maintained for safety reasons";}
        )

    [_yoast_wpseo_primary_category] => Array
        (
            [0] => 599
        )

    [_yoast_wpseo_metadesc] => Array
        (
            [0] => The state legislative assembly was today told that the implementation of the undersea tunnel will be considered by the state government after the North Butterworth Container Terminal Expansion Plan has been finalised by the Penang Port Commission (SPPP) in December 2023.
        )

    [_yoast_wpseo_content_score] => Array
        (
            [0] => 30
        )

    [_yoast_wpseo_estimated-reading-time-minutes] => Array
        (
            [0] => 2
        )

    [_yoast_wpseo_wordproof_timestamp] => Array
        (
            [0] => 
        )

    [post_views_count_7_day_arr] => Array
        (
            [0] => a:7:{i:0;a:2:{s:4:"date";i:0;s:5:"count";i:0;}i:1;a:2:{s:4:"date";i:0;s:5:"count";i:0;}i:2;a:3:{s:4:"date";s:10:"1752666284";s:5:"count";i:1;s:14:"per_hour_count";a:1:{i:11;i:1;}}i:3;a:2:{s:4:"date";i:0;s:5:"count";i:0;}i:4;a:2:{s:4:"date";i:0;s:5:"count";i:0;}i:5;a:2:{s:4:"date";i:0;s:5:"count";i:0;}i:6;a:2:{s:4:"date";i:0;s:5:"count";i:0;}}
        )

    [post_view_7days_last_day] => Array
        (
            [0] => 2
        )

    [post_views_count_7_day_last_date] => Array
        (
            [0] => 1752666284
        )

    [post_views_count_7_day_total] => Array
        (
            [0] => 1
        )

    [post_views_last_24_hours] => Array
        (
            [0] => 1
        )

    [post_views_last_48_hours] => Array
        (
            [0] => 1
        )

)
Penang will consider undersea tunnel after NBCT plan finalised | Scoop

Penang will consider undersea tunnel after NBCT plan finalised

Zairil Khir Johari says based on port commission’s comments, ship navigation width of 2.2m has to be maintained for safety reasons

6:52 PM MYT

 

GEORGE TOWN – The state legislative assembly was today told that the implementation of the undersea tunnel will be considered by the state government after the North Butterworth Container Terminal Expansion Plan has been finalised by the Penang Port Commission (SPPP) in December 2023. 

Penang Infrastructure and Transportation Committee chairman Zairil Khir Johari said based on the comments of SPPP, the ship navigation width of 2.2km in the waters on the north port area has to be maintained to ensure safe navigation space for ship movements. 

“With the trend towards building larger ships and the optimal ship size between 13,000 20ft equivalent units (TEU) to 15,000 TEU to enter and stop at the port, these ships are expected to have water loads (draft) maximum of 16m. 

“While the minimum safe depth for a safe passage for ships of this size is 23m from sea level,” he said when winding up the motion of thanks to the Penang governor’s address at the state assembly sitting today. 

Therefore, he said that among the considerations of this undersea tunnel project is its alignment so that it does not become a disturbance or obstacle to the extension of the additional wharf. 

Touching on the issue of the Penang South Island project (PSI), Zairil said following the approval of the Environmental Management Plan on July 21, the reclamation of Silicon Island began in September with the installation of buoys marking the project site area and a silt curtain to deal with silt dispersion during reclamation work. 

“After the silt curtain was properly installed, sand filling work was also started at the site where, to date, approximately three acres of land has been formed at the Silicon Island site. 

“According to the project planning, the first piece of land, which is the industrial land that will be known as Green Tech Park, is expected to be completed in December 2025 while Silicon Island, which covers an area of 2,300 acres, is expected to be completely filled in 2032,” he said.​ – November 23, 2023

Topics

 

Popular

Women Ministry plans to set up e-filing system for lodging sexual harassment reports

The Women, Family and Community Development Ministry intends to develop an e-filing system to enable more victims of sexual harassment outside Putrajaya to lodge complaints with the Anti-Sexual Harassment Tribunal

Avoid tragedy: Rayer demands ‘humane’ trainers after UiTM cadet’s death

The Jelutong MP calls for screenings to ensure trainers are qualified

American faces trial for causing death in nightclub fight

A technician from the United States pleaded not guilty at the sessions court here today to a charge of causing the death of a local man at an entertainment outlet last month.

Related