Array
(
    [_edit_lock] => Array
        (
            [0] => 1703916252:20
        )

    [tdc_dirty_content] => Array
        (
            [0] => 1
        )

    [tdc_icon_fonts] => Array
        (
            [0] => a:0:{}
        )

    [post_views_count] => Array
        (
            [0] => 191
        )

    [_thumbnail_id] => Array
        (
            [0] => 150871
        )

    [_edit_last] => Array
        (
            [0] => 20
        )

    [_post_language] => Array
        (
            [0] => 
        )

    [_molongui_author] => Array
        (
            [0] => guest-97702
        )

    [_molongui_main_author] => Array
        (
            [0] => guest-97702
        )

    [td_post_theme_settings] => Array
        (
            [0] => a:1:{s:11:"td_subtitle";s:141:"Chief minister orders five immediate measures to monitor, repair underground pipeline, implement permanent solution to avoid future incidents";}
        )

    [_yoast_wpseo_primary_category] => Array
        (
            [0] => 599
        )

    [_yoast_wpseo_metadesc] => Array
        (
            [0] => The Penang government has received a preliminary report from the Penang Water Supply Corporation regarding a burst pipeline incident in Sg Perai, Butterworth, near here, and ordered five immediate measures to be implemented.
        )

    [_yoast_wpseo_content_score] => Array
        (
            [0] => 30
        )

    [_yoast_wpseo_estimated-reading-time-minutes] => Array
        (
            [0] => 2
        )

    [_yoast_wpseo_wordproof_timestamp] => Array
        (
            [0] => 
        )

    [post_views_count_7_day_arr] => Array
        (
            [0] => a:7:{i:0;a:2:{s:4:"date";i:0;s:5:"count";i:0;}i:1;a:2:{s:4:"date";i:0;s:5:"count";i:0;}i:2;a:2:{s:4:"date";i:0;s:5:"count";i:0;}i:3;a:2:{s:4:"date";i:0;s:5:"count";i:0;}i:4;a:2:{s:4:"date";i:0;s:5:"count";i:0;}i:5;a:2:{s:4:"date";i:0;s:5:"count";i:0;}i:6;a:3:{s:4:"date";s:10:"1751163144";s:5:"count";i:1;s:14:"per_hour_count";a:1:{i:2;i:1;}}}
        )

    [post_view_7days_last_day] => Array
        (
            [0] => 6
        )

    [post_views_count_7_day_last_date] => Array
        (
            [0] => 1751163144
        )

    [post_views_count_7_day_total] => Array
        (
            [0] => 1
        )

    [post_views_last_24_hours] => Array
        (
            [0] => 1
        )

    [post_views_last_48_hours] => Array
        (
            [0] => 1
        )

)
Penang govt demands swift actions from PBAPP after Sg Perai pipeline burst chaos | Scoop

Penang govt demands swift actions from PBAPP after Sg Perai pipeline burst chaos

Chief minister orders five immediate measures to monitor, repair underground pipeline, implement permanent solution to avoid future incidents

1:44 PM MYT

 

GEORGE TOWN – The Penang government has received a preliminary report from the Penang Water Supply Corporation (PBAPP) regarding a burst pipeline incident in Sg Perai, Butterworth, near here, and ordered five immediate measures to be implemented.

Chief Minister Chow Kon Yeow said that one of them is that PBAPP must monitor the Sg Perai underground pipeline, which is being repaired, on a daily basis, until a permanent solution can be implemented.

“The permanent solution is to install a pipeline across the river, which will be supported by a structure above the surface and has an estimated cost of RM5 million. It should be completed as soon as possible in 2024 to allow for periodic inspections and avoid recurrence,” he said in a statement today.

About 200,000 consumers in Barat Daya (island part) and Seberang Perai experienced water supply disruption following the temporary closure of a 1,350mm pipeline in Sg Perai, which burst on December 18.

He said that PBAPP also needs to detect and report the location of other underground pipelines in the state and should carry out special inspections for all other pipelines to detect any danger or risk of similar accidents.

Chow said that the team of experts should regularly inspect all main pipelines, which are 900mm and above, and explore methods to detect potential defects or failures.

He said that, apart from that, the state government also requested the replacement of the old main pipeline, which is 900mm and above, to be expedited.

“PBAPP also needs to ensure the restoration of water supply services for the 590,000 water users affected by the scheduled water supply interruption from January 10, according to the previously announced schedule.

“Water supply for the remaining 0.2% of affected users, which is about 1,000 users residing at the end of the distribution line and on higher ground with specific issues, must also be restored as soon as possible after 96 hours,” he said.

He added that, based on the findings from the initial report submitted by PBAPP, it was found that the cause of the incident was unknown and difficult to ascertain because the pipeline was located 3.5m below, at the bottom of Sg Perai.

He said that the broken pipeline had to be repaired immediately as it caused a leak, which resulted in a sudden drop in water pump pressure for 200,000 water users in Penang, which affected the water supply service to the Barat Daya district and some areas in Seberang Perai.

“The people and the state government expect PBAPP to do more and perform better in January 2024,” he said. – December 30, 2023

Topics

 

Popular

After nasi kandar place, trouble brewing for local pub for illegally screening Astro channels

Measast Broacast Network Systems files suit against Brew Nation for displaying sports content in premises at Bandar Rembayu via TV box and possibly pirate sites

Halal now not only about ‘no pork’ and ‘no alcohol’: Anwar

Prime Minister says the label is also about health, hygiene, effectiveness and modern technology

Adam Radlan claims trial to using proceeds from an unlawful activity

Segambut Bersatu deputy chief Adam Radlan Adam Muhammad has claimed trial to a charge of using proceeds from an unlawful activity.

Related