Works minister orders immediate inspection of cracks on Jalan Cheras flyover

Datuk Seri Alexander Nanta Linggi directs highway authority, SPE concessionaire to act

1:31 PM MYT

 

KUALA LUMPUR – The Malaysian Highway Authority and the Setiawangsa-Pantai Expressway (SPE) concessionaire have been instructed to immediately inspect the cracks on the Jalan Cheras flyover.

In a post on X, Works Minister Datuk Seri Alexander Nanta Linggi said the safety of all quarters, especially road users, must be prioritised.

He said this in response to a post on X that pointed out the increasingly visible cracks on the flyover.

“I take this matter seriously,” he added.

The SPE, fully opened on November 3 last year, features a dual carriageway and seven elevated interchanges.

The expressway is divided into four main sections, namely Kerinchi-Salak (Section 1), Salak-Pandan (Section 2), Pandan-Setiawangsa (Section 3) and Setiawangsa-Taman Melati (Section 4), spanning a total distance of 20.7km.

It connects several other highways, including the SPRINT Expressway, Ampang-Kuala Lumpur Elevated Highway, Duta-Ulu Kelang Expressway and Kuala Lumpur Middle Ring Road 2, to enhance network efficiency and reduce congestion in Kuala Lumpur. – June 8, 2024

Topics

 

Popular

Sarjit admits tough Australia tour key to Speedy Tigers’ growth

National coach prioritises player development over results in challenging six-match series

Vehicles plough into pedestrians in vicious hit-and-run attack near Old Klang Road

Two individuals left injured as sedan and pickup truck deliberately ram into group, police probe attempted murder

Budget 2025: KBS urged to collaborate with KPKT for grassroots talent development

National junior hockey coach calls for increased funding and joint efforts between Youth and Sports Ministry and Housing and Local Government Ministry to utilise underused facilities and nurture future athletes for the 2027 SEA Games

Related